- Design and build the pathways, spatial requirements and equipment locations for the development according to our guidelines below
- Upload a pre-construct design for us to review and accept
- Build the pathway works and provide spatial requirements according your approved pre-construct design and our guidelines
- Submit a Notice of Practical Completion (PCN) for us to review
- Remediate your designs and build (if needed)
- Advise builders to supply the in-home cabling
- Review and accept plans and designs
- Introduce an nbn™ approved Delivery Partner to the process after the pre-delivery pathway inspection
- Conduct and accept the site inspection of your pathway works
- Work with our nbn™ approved Delivery Partner to connect fibre internally at the premises (this takes a minimum of eight weeks)
- Notify you that the site is in service so that the occupant can place an order with their preferred phone and internet provider.